These common "mined areas" for lifting appliances beware!

Time : 2025-11-25

These common "mined areas" for lifting appliances beware!

picture

Safe Use

Hoisting machinery

@ Heavy machinery use unit

picture

In order to deepen the company's understanding of lifting machinery

Secure Use and Management

Keep the gears "safe" for a long time.

These common "mined areas." Be careful to avoid pitfalls!

picture

01

Missing technical information

picture
picture

In accordance with Article 92 of the Regulation on the Supervision and Administration of Special Equipment Users in the Implementation of the Main Responsibility for Safety , lifting machinery safety personnel shall be responsible for establishing and improving lifting machinery safety technical files and handling lifting machinery use registration of the unit . The technical data to be archived and kept by the user , including the last inspection report and the use registration certificate , as well as the use record of the user ( including the daily use status , maintenance , repair , self-inspection , operation failure and accident records ) .

In practical work , there are often units that do not attach enough importance to the preservation of technical data , resulting in the loss of technical data and failing to cooperate in the preparation of technical data for periodic inspection of cranes .

图片
图片
图片

图片

02

Mismanaged use

图片
图片

According to the requirements of TSG08-2017 "Special Equipment Use Management Rules," special equipment users need to:

1. Establish and effectively implement special equipment safety management systems and operating procedures;

2. Procurement and use of licensed production (including design, manufacture, installation, alteration, repair) and inspection-proven special equipment, shall not procure special equipment that exceeds the design lifespan, and the use of special equipment that is phased out by the State and has been scrapped;

3. Establish special equipment safety management bodies with corresponding safety managers and operation personnel, establish personnel management accounts, conduct safety and energy conservation training education, and maintain personnel training records;

4. Establish special equipment ledgers and technical archives;

5. Inspect the operational conditions of special equipment operators to promptly stop illegal operations.

图片

图片

03

Lack of risk management mechanism

图片
图片

The use unit did not establish a management mechanism for safety risk prevention and control of cranes

In accordance with the requirements of articles 93 and 94 of the Rules on Supervision and Management of the Main Responsibility for the Use of Special Equipment, The use units of lifting machinery shall establish a dynamic management mechanism based on the prevention and control of safety risks of lifting machines, implement self-inspection requirements in accordance with the actual situation of the unit, formulate a checklist for safety risk control of lifting equipment, and establish and improve a system and mechanism for daily control, weekly inspection, and monthly scheduling. If safety risks and hazards are discovered, preventive measures should be taken immediately and promptly reported to the director of safety of lifting machinery or the principal responsible person of the unit.

Crane remote control emergency stop switch not up to standard or not installed with double height limiter

According to the Rules for the Periodic Inspection of Heavy Machinery, lifting machinery should be equipped with a tight (should) emergency stop switch, and the design of the tight (ought) emergency stopp switch should comply with the requirements of the GB 16754-2008 Principles for the Safety of Emergency Stop Design. The emergency stop switch is generally red and cannot be reset automatically. The emergency stop switch can only be restored after manual reset, and the lifting appliance can operate according to certain procedures.

图片

The pause button in the remote control in the diagram can be reset automatically,

It does not meet the requirements.

图片

The remote pause in the picture is the mushroom head spinning button,

Can meet fault locking and meet requirements.

According to the Notice of the General Office of the General Administration of Market Supervision on carrying out hazard screening and management work on lifting machinery, a height limit device different from the original configuration form is added to the bridge and door cranes to ensure that the device meets the requirements of the "dual limit" device.

图片

A second set fitted

A height limiting device

(Heavy hammer)

图片

Driven height limiting device

A reminder:

Common use units were not equipped with "dual capacity" devices as required. Therefore, during self-inspection, the use units should pay attention to and install the double height limit in time as required.

图片

Safe use of lifting appliances

It is an important safeguard for the production of enterprises.

Users should implement this effectively

Main responsibility for security management

Do your own inspection of lifting machinery.

Implement the responsibility for the safety of lifting appliances!